-40%
Disneyland America Sings - seven (7) blueprints of facilty, WED (pre-WDI) 1974
$ 158.4
- Description
- Size Guide
Description
Disneyland America Sings - seven (7) blueprints of facilty, WED (pre-WDI) 1974.Seven Blueprints 33” x 45”
Stage Layout plans “D Drawings”
D-1 Stage Layout Plan Stage #1 - #6
D-1-P Stage Layout Plan Stage #1 - #6Painting Location Plan and Color Scheme
D-51 Stage #1 Load and #6 Unload Set and animation Plan and Elevation
D-101 Set And Animation Plan, Stage 2, Act 1
D-201 Set and Animation Plan and Elevation, Stage 3, Act II Going West
D-301 Set and Animation Plan, Stage 4, Act III
D-401 Set and Animation Plan & Elevation, Stage 5, Act IV “Modern Times”
America Sings opened on June 29, 1974, replacing the General Electric-sponsored Carousel of Progress attraction, which had moved to the Magic Kingdom at the Walt Disney World in 1973. America Sings used the same Carousel Theater as its predecessor. The building had an outer ring of six theaters, connected by divider walls, that revolved mechanically about every four minutes around the six fixed stages in the center of the building.
[It was closed in 1988] - Wikipedia
The D series drawings are for the ‘Show Aspect’ and indicates locations of animatronic figures and animals, walls, major props, etc.
These blueprints were originally printed in the 1990s.
The big yellowish borders show the fading along the fold lines.
The folds are crisp and the points of the folds show very little wear. There is one short tear in D-201 along the fold. (as seen in photo)